Dongguan Sheng Rui Precision Mould Co., Ltd.

Precision molds that strive for superior quality, only for customer satisfaction!

Manufacturer from China
Active Member
7 Years
Home / Products / Injection Mould Parts /

TPV Plastic Moulding Parts Mould PBT/PVC/TPE/TPU/TPEE

Contact Now
Dongguan Sheng Rui Precision Mould Co., Ltd.
City:dongguan
Province/State:guangdong
Country/Region:china
Contact Person:MrTonny Liu
Contact Now

TPV Plastic Moulding Parts Mould PBT/PVC/TPE/TPU/TPEE

Ask Latest Price
Video Channel
Brand Name :Sheng Rui
Model Number :SR-PJ0823
Place of Origin :China
Certification :ISO9001: 2015
MOQ :1
Price :according to the drawings
Packaging Details :Anti-Rust Oil, PE film covered first, Foam box, then carton
Delivery Time :Normally, simple parts, 7-15 days, complicated parts 15-20 workdays, according quantity and the complexity of drawing.
Payment Terms :T/T
Design Software :UG, PROE, CAD, CAXA, Etc.
Mould Standard :HASCO, DME, MISUMI, Etc.
Material :ABS/ PC/ PP/ PE/ PA/ POM/ PMMA/ PBT/ PVC/ TPE/ TPU/ TPEE/ TPV/ PA6/ PA66/ PA12/ PA11/ PA46/ PA4T/ PA6T/ PA9T/ PA610/ PA612/ PA1010/ PA1012/ PA6I/ PA6T/ PA11I/ PA12GF/ PA46GF/ PA6GF/ PA66GF/ PA6G/ PA11G/ PA12G/ PA4G/ PA6G30/ PA6G35/ PA6Gf30/ PA6Gf35/ PPS/ P
Surface Finish :Polishing/ Texture/ EDM/ High Gloss/ Etc.
Runner :Hot/Cold
Lead Time :15-45 Days
Mould Package :Wooden Case/Crate
Cavity :Single/Multi
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Product Description:

Injection Mould Parts are precision mould parts that are made with high quality material and advanced manufacturing techniques. They are often used in CNC turning parts and are highly precise and reliable. Mould Treatment such as Nitriding, Quenching, Tempering and Polishing can be used to improve the parts' strength, durability and appearance. Mould Accessories are available in both standard and non-standard sizes. Lead time is usually around 15-45 days and the surface finish can be customized to achieve Polishing, Texture, EDM, High Gloss and other effects. The material used in the production process includes ABS, PC, PP, PE, PA, POM, PMMA, PBT, PVC, TPE, TPU, TPEE, TPV, PA6, PA66, PA12, PA11, PA46, PA4T, PA6T, PA9T, PA610, PA612, PA1010, PA1012, PA6I, PA6T, PA11I, PA12GF, PA46GF, PA6GF, PA66GF, PA6G, PA11G, PA12G, PA4G, PA6G30, PA6G35, PA6Gf30, PA6Gf35, PPS, PPSU, PEEK, PC+ABS, PC+PBT, PC+PET, PC+PA, PC+GF, AS, ABS+PC, ABS+GF, ABS+AS, ABS+PA, PBT+PET, PBT+GF, PBT+PA, PET+PA, PET+GF, PA+GF, PA+AS, PA+PBT, PA+PET, POM+GF, POM+PA, POM+AS, POM+PBT, POM+PET, PBT+PET+GF, PBT+PET+PA, PA+GF+PBT, PA+GF+PET, PA+GF+AS, PA+GF+PBT+PET, PA+GF+PBT+AS, PA+GF+PBT+PET+AS.

Features:

  • Product Name: Injection Mould Parts
  • Design Software: UG, PROE, CAD, CAXA, Etc.
  • Mould Steel: P20, 718, 738, NAK80, S136, H13, Etc.
  • Ejector pins, precision mould parts, cnc turning parts
  • Mould Testing: Video/3D Projection/X-Ray/CMM/etc.
  • Surface Finish: Polishing/ Texture/ EDM/ High Gloss/ Etc.
  • Mould Package: Wooden Case/Crate

Applications:

Injection Mould Parts, made by Sheng Rui with model number SR-PJ0823, is certified with ISO9001:2015 and provided with a minimum order quantity of 1. The price of the product varies according to the drawings and it is packaged with anti-rust oil, PE film, foam box, and then carton. Delivery time for simple parts is usually 7-15 days and for complicated parts, it is 15-20 working days, depending on the quantity and complexity of the drawing. Payment terms are usually T/T and mould package is wooden case or crate. The mould life of this product is usually 500,000-1,000,000 shots and the materials used are ABS/ PC/ PP/ PE/ PA/ POM/ PMMA/ PBT/ PVC/ TPE/ TPU/ TPEE/ TPV/ PA6/ PA66/ PA12/ PA11/ PA46/ PA4T/ PA6T/ PA9T/ PA610/ PA612/ PA1010/ PA1012/ PA6I/ PA6T/ PA11I/ PA12GF/ PA46GF/ PA6GF/ PA66GF/ PA6G/ PA11G/ PA12G/ PA4G/ PA6G30/ PA6G35/ PA6Gf30/ PA6Gf35/ PPS/ PPSU/ PEEK/ PC+ABS/ PC+PBT/ PC+PET/ PC+PA/ PC+GF/ AS/ ABS+PC/ ABS+GF/ ABS+AS/ ABS+PA/ PBT+PET/ PBT+GF/ PBT+PA/ PET+PA/ PET+GF/ PA+GF/ PA+AS/ PA+PBT/ PA+PET/ POM+GF/ POM+PA/ POM+AS/ POM+PBT/ POM+PET/ PBT+PET+GF/ PBT+PET+PA/ PA+GF+PBT/ PA+GF+PET/ PA+GF+AS/ PA+GF+PBT+PET/ PA+GF+PBT+AS/ PA+GF+PBT+PET+AS. This product can be tested by video/3D projection/X-ray/CMM and the mould steel used is usually P20, 718, 738, NAK80, S136, H13, etc. Injection Mould Parts by Sheng Rui is perfect for precision machining, CNC turning parts and precision mould parts.

Customization:

Customized Injection Mould Parts

Brand Name: Sheng Rui
Model Number: SR-PJ0823
Place of Origin: China
Certification: ISO9001: 2015
Minimum Order Quantity: 1
Price: According to the drawings
Packaging Details: Anti-Rust Oil, PE film covered first, Foam box, then carton
Delivery Time: Normally, simple parts, 7-15 days, complicated parts 15-20 workdays, according quantity and the complexity of drawing.
Payment Terms: T/T
Lead Time: 15-45 Days
Mould Accessories: Standard/Non-Standard
Mould Base: LKM, HASCO, DME, FUTABA, MISUMI, Etc.
Mould Package: Wooden Case/Crate
Mould Steel: P20, 718, 738, NAK80, S136, H13, Etc.
Specialized in: Ejector pins, precision mould parts, Ejector pins, plastic injection parts

Packing and Shipping:

Injection Mould Parts Packaging and Shipping:

  • The parts should be packed in waterproof packages with cushioning material inside to protect them against any damage during shipping.
  • The packages should be clearly labeled with the company name and order number.
  • The parts should be shipped by a reliable courier service with insurance and tracking number.

FAQ:

Q&A about Injection Mould Parts:

Q1: What is the brand name of this product?

A1: The brand name of this product is Sheng Rui.

Q2: What is the Model Number of this product?

A2: The Model Number of this product is SR-PJ0823.

Q3: Where is this product made?

A3: This product is made in China.

Q4: What is the minimum order quantity of this product?

A4: The minimum order quantity of this product is 1.

Q5: What is the Price of this product?

A5: The Price of this product is according to the drawings.

Inquiry Cart 0